Skip to main content
We met investors and project developers at EIF 2026
Events

We met investors and project developers at EIF 2026

At the 20th EIF Energy Transition Fair in ANFAŞ Antalya, we reviewed our pre-feasibility reports for wind, solar and hybrid projects with visitors at Hall 1, Booth E135.

November 16, 2026MertEvents29 views
We met investors and project developers at EIF 2026 1
1 / 3

From 5 to 7 November 2026, CO HYBRID ENERGY took part in the 20th EIF Energy Transition Fair at ANFAŞ Expo Center, Antalya, at Booth E135 in Hall 1. Over three days we met investors, project developers and industry professionals.

What we discussed at our booth

Technical pre-feasibility was at the centre of our conversations. With visitors, we went page by page through the sample reports we prepare for unlicensed solar, unlicensed wind and hybrid projects. We looked at how resource and site analysis, equipment options, the match between generation and consumption, net metering and the financial outlook come together in a single report.

The “8,760” sign at our booth sums up our approach in one number. A year has 8,760 hours, and our software calculates generation and consumption for each of them separately. This reveals differences that an assessment based on monthly totals can miss. We explain this in detail in this article (in Turkish).

We also discussed, with examples, how software-supported analysis differs from the classic engineering process. Comparing installed capacity, equipment and storage scenarios on the same data in a short time puts the investment decision on firmer ground.

After the fair

Thank you to everyone who visited our booth. We are continuing the conversations that started at the fair, project by project.

If you would like to discuss the scope and price of a pre-feasibility study for your project, reach us through our contact page or at [email protected]. You can explore our software products and sample reports on our home page.